CP Blog Entry #10 Did your projected plan on your Proposal Template (M1.4) develop naturally or was the process in need of rearranging?

My projected plan on my proposal template needed some rearranging since I had changed my project at the last minute.  I had a plan all set with desired outcomes about the LESRA model.  My lesson plans for the project changed after only a few weeks of trying the LESRA model and realized I needed to switch gears.  The focus (of increasing math scores) was the same but implementing it was off to a slower than expected start.  I also had to re-plan for this new method.  The MFAS assessments have helped to group the students and the small group instruction is working out great too!

On a separate note, we are beginning to take our MOY (middle of year) diagnostic test for i-ready.  This will be more accurate than the progress monitoring results.  All of my students' scores increased for reading so I am hoping they should have increased for math as well.  Next week will be the math test.

6 comments:

  1. It sounds like your change project is coming along nicely! I hope you get the expected results for your Math MOY, also.

    ReplyDelete
  2. I am glad to hear your project is going well. I also have had to slow my implementation. Did you have to change your plans a lot or just some minor tweaks?

    ReplyDelete
  3. I understand the need to make changes. While change can be challenging, it reassures me that it's ok since the name of this endeavor is called a Change Project! I'm also anxious to analyze the MOY iReady math data for the class I am working with.

    ReplyDelete
  4. Since I am posting to this today, I am wondering how the results of your students' math scores for MOY turned out?

    ReplyDelete
    Replies
    1. My results were an increase from a class average scale score of 350 to a 378. I hope it continues to make that trend by the end of the year! :)